IRONPEAK CONSTRUCTION

The structure, bid scope by scope.

Three self-performed scopes, each with its own lump sum, inclusions, exclusions and unit prices. Price one, two or all three.

Structural concrete

Cast-in-place structure from the bottom of footing to the top of slab.

Included

  • Spread, strip and mat footings
  • Frost walls to the 42" frost depth, grade beams, pier caps
  • Slab-on-grade with vapor retarder, saw cuts and joint sealant
  • Slab on metal deck and podium decks
  • Rebar furnished and placed, anchor bolt and embed setting
  • Equipment pads, dock aprons and stoops

Excluded unless listed

  • Excavation and backfill beyond footing hand cleanup
  • Testing agency fees
  • Under-slab plumbing and electrical
  • Polished or decorative finishes

Structural steel and metal deck

Erection of steel supplied by your fabricator, or furnish and install when the bid form calls for it.

Included

  • Columns, beams, bracing, joists and joist girders
  • High-strength bolting and field welding
  • Roof deck and composite floor deck
  • Shear studs and deck edge angle
  • PEMB primary and secondary framing
  • Crane, rigging plan and erection sequence

Excluded unless listed

  • Fireproofing and field painting beyond touch-up
  • Third-party special inspection
  • Roofing and wall panels

Miscellaneous metals

Shop-fabricated metals furnished and installed by our crews.

Included

  • Pan stairs with concrete-fill treads
  • Guardrails, handrails and wall rails
  • Loose lintels and relieving angles
  • Embed plates and pour stops
  • Pipe bollards, ladders and roof hatch framing

Excluded unless listed

  • Ornamental and glass railings
  • Architectural metal panels
Illustrative product interface

Bolts surveyed before the first column flies.

Because our concrete crew sets anchor bolts and our steel crew erects to them, we survey every bolt group before steel delivery and fix misses before the crane is on site. Erection is sequenced by bay so deck and studs can follow the next day.

Winter concrete

Twin Cities temperatures reach -20°F and frost goes 42 inches deep. Our winter package covers ground thaw ahead of footings, heated tarp or framed enclosures, insulated curing blankets, accelerating admixtures where the mix design allows, and temperature readings logged every four hours through the cure period.

It is priced as a separate per-cubic-yard line, so your team can decide whether to carry it or reschedule a placement.

How we price

  • Lump sum per scope, with inclusions and exclusions written out.
  • Unit-price sheet for adds and deducts during buyout and construction.
  • 30-day price hold. Steel and rebar carry an escalation clause tied to mill invoices.
  • Monthly AIA G702/G703 billing against the schedule of values, with lien waivers each draw.
Illustrative product interface

Reference rates for 2026 Twin Cities work. Each bid states its own unit prices based on the drawings, quantities and schedule.

Need a number for bid day?

Send a bid invitation